Construction assurance and system validation is a time-consuming, complicated process with a high-risk associated with the final construction stages and progressively introducing rolling stock to the electrified network.
T-RIS have led data analysis, developed a compliance matrix and compiling the technical submission required by independent Designated Body (DeBo) and Notified Body (NoBo) organisations, helping multiple electrification projects to achieve authorisation by proving conformance to the National Technical Specification Notices NTSNs or the Technical Specifications for Interoperability (TSIs).
Our experience in delivering for a wide variety of projects and fulfilling different roles across Europe and Australia means that we are well positioned to support your project, wherever you are located.
‘Right first time’
Our technical experience in the field and data insights support project decisions towards achieving the timetable change timelines and providing technical assurance throughout the commissioning of the newly installed infrastructure. We recently led the MMLE L2C commissioning data analysis and reporting managing to gain an unprecedented clean authorisation with no conditions for the 40km / 192STK of newly electrified network.