DC System conformance

Novel DC system simulation based on onsite infrastructure geometry recovery from train-borne wire profilometry.

DC system interface performance often pose a great challenge when the asset has to perform under increased speeds and accommodate multi-pantograph trainsets. The requirement for multiple wires results in added complexity setting up and maintaining the OCS network whereas the increased pantograph carbon carrier weights result in larger masses near the interface that can significantly impact the interface performance.  

Year:
2020
Category:
Digital Twins
Client:
Mott MacDonald, Sydney Metro